|
|
Automatic Glass Jar Spray Painting Line |
|
Machine : Automatic Glass Jar Spray Painting Line |
Machine Model : |
Details : |
Automatic Glass Jars Spray Painting Line
Workflow of Automatic Spray Painting Line
1. Products In-feed & Loading to conveyor system
2. Flame guns & Ionized blowers for surface cleaning and preparation of products
3. #1 Spray Booth with 2 sets of Electrostatic Turbo Bells for 1st Color / 1st Layer coating
4. #1 Electric Baking Oven for Flash-off and surface drying of 1st color / 1st layer coating
5. #2 Spray Booth with 2 sets of Electrostatic Turbo Bells for 2nd Color / 2nd Layer coating
6. #2 Gas Burner Baking Oven for Overall drying of the paint
7. Cold-down area for finshed products
8. Finished Products Out-feed & Unloading system
Advantage of our machine
1. Equipped with Electrostatic Turbo Bell, which is the most advanced and lastest technology for glassware.
Perfect coating result and high paint efficiency can be achieved at the same time.
(for more information about our Electrostatic Turbo Bell, please contact us for more information Send us an email. )
2. Equipped with clean room, fresh air filtering & supplying system, exhausting system.
Products are processed in a clean environment.
3. High output upto 80 pcs./min. (machine output can be customized based on your demand)
4. Universal to all glass products: bottles, jars, tableware, drinking glass, etc.
5. Fully automatic design with least labor requirements.
Workers only need to load raw products and unload finished products.
6. Flexible design and size.
Automatic line can be customized base on your actual demand.
7. Turn-key project, installation and training will be conducted in your factory.
Build a line special for your project
Spray Painting Line can be customized based on your project and products
What can be customized:
1. Size and Layout of the machine, from compact (6 meter X 9 meter) to as big as you want
2. Output of the machine, from 20 pcs./min to 80 pcs./min
3. Capability, single layer coating or double layers coating
4. Investment amount, from economic design to fully automatic design
Even if you are in the early stages of planning your project, we would love to talk.
Send us an email. |
|
[Next : ]→
|
|